Archi Quote Compare

Digging near next door? Get your excavation notice right first

Cross-section of a neighbour’s house on shallow foundations with a 45 degree line and a deeper new excavation beside it

For homeowners in England and Wales whose extension, basement or new build involves deep digging close to next door. Compare quotes from party wall surveyors who can prepare the notice and the drawings it needs.

The Party Wall etc. Act 1996 covers digging close to a neighbour’s building as well as work to a shared wall. A notice of adjacent excavation is needed, at least one month before the work, in two cases. One is digging within three metres of a neighbouring building and deeper than its foundations. The other is digging within six metres where the dig cuts a line sloping down at 45 degrees from the bottom of those foundations. The notice must include plans and sections showing where and how deep you will dig, and say whether you propose to strengthen or safeguard the neighbour’s foundations. A structural engineer should design the dig, with temporary support worked out, before any ground is broken.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Excavation notices and your other approvals

Questions people ask

How do I know whether my excavation needs a notice?

The Act applies in two cases. One is digging within three metres of a neighbouring building and deeper than its foundations. The other is digging within six metres where the dig cuts a line sloping down at 45 degrees from the bottom of those foundations. A party wall surveyor can check this from the drawings, as it depends on the exact depths and distances.

How do I find out how deep next door’s foundations are?

There are rarely records, and foundations vary with the age of the building, the ground and any past work. A trial pit, a small hole dug beside the wall to look at the footing, is the usual way to find out. Your structural engineer or surveyor can arrange it.

What should the notice say about my neighbour’s foundations?

It must say whether you propose to strengthen or safeguard the neighbour’s foundations, such as by underpinning or temporary support, and it must include plans and sections of the excavation. Your structural engineer designs any such protection, and the surveyor puts it into the notice.

Do I need an excavation notice and a party structure notice for a basement?

Often both. A basement usually involves digging next to the party wall and may also involve underpinning it, which is work to the wall itself. The notices cover different parts of the work, and a party wall surveyor can confirm which you need and prepare them together.

Can I start digging before the notice period is over?

No. Excavation shouldn’t begin until the notice period and any agreement are in place, and the dig should follow a design prepared by a structural engineer. Deep or close digging without a design and temporary support can put a neighbour’s home at risk, and starting without notice can bring disputes and claims.

Available across the UK

Party wall surveyors cover the whole of the UK. The Party Wall etc. Act 1996 applies in England and Wales; Scotland and Northern Ireland have different rules, and a professional can tell you what applies to your property.