Building work finished? Get the property checked for damage

Two report pages side by side, before and after building work, with matching photo frames ticked and a magnifier checking one

For neighbours and building owners in England and Wales. A party wall surveyor compares the property with the schedule of condition and records any damage and repairs needed. Compare quotes free.

When the building work is finished, the surveyors go back. A post-works inspection compares the neighbour’s property with the schedule of condition made at the start, room by room, and records anything that has changed. If nothing has, both owners get a clear record that the job closed without damage. If something has, the surveyors list what needs repairing and who will do it. Under the Party Wall etc. Act 1996, in England and Wales, the building owner is expected to make good damage caused by the work, and the inspection is where that is agreed.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

How the Act deals with damage and completion

Questions people ask

When should the post-works inspection take place?

Soon after the building work finishes, so any damage can be linked to it and put right while the builder is still on the job. Some minor cracking can appear later as plaster dries and buildings settle, so ask your surveyor whether a second look after a few months is sensible.

What if I find a crack after the inspection has been signed off?

Report it in writing straight away, with dated photos. If it is new, the surveyors may be able to deal with it, depending on the wording of the award. Keep your records and don’t repair it before it has been looked at, unless it looks unsafe. If the cause is unclear, a structural engineer can investigate.

Do I have to allow the inspection?

The Act allows surveyors to enter the property during usual working hours to carry out their duties, and in practice they arrange a time with you. Co-operating usually works in your favour, as it is how damage gets recorded and put right. If you can’t be there, arrange for someone to give access, or agree another time with the surveyor.

Why would a building owner want an inspection too?

A written record that the neighbour’s property came through the work without damage, or that damage was put right, closes the matter. It helps if a claim is made later, or if a buyer’s solicitor asks whether party wall work was completed with nothing outstanding. A surveyor can tell you what record is practical for your job.

Is an inspection still worthwhile if the neighbour consented and there is no award?

It is less formal, but still a good idea if a schedule of condition was done. If there was no schedule, an inspection is still possible, but it is harder to prove what changed. A surveyor can tell you what is practical for your situation.

Available across the UK

Party wall surveyors cover the whole of the UK. The Party Wall etc. Act 1996 applies in England and Wales; Scotland and Northern Ireland have different rules, and a professional can tell you what applies to your property.