Archi Quote Compare

Get the Part O overheating assessment your new homes need

Blueprint section of a top-floor room with sun rays, shading fins above the window, a hot thermometer and a temperature chart

For developers, self-builders and designers of new homes and residential buildings in England and Wales. Compare quotes from professionals who can check overheating risk early and give building control the evidence it needs.

Part O of the Building Regulations in England requires new homes and other new residential buildings, such as care homes and student accommodation, to limit unwanted summer sun and remove excess heat. Compliance is shown either by the simplified method, which limits glazing and sets minimum openable areas according to the location and layout of the home, or by dynamic thermal modelling using the TM59 method. Wales has a similar requirement of its own, and Scotland has a separate overheating standard for new homes. Part O also considers noise, security and safety, because the windows that cool a home have to be usable at night. A good assessor checks the risk while the design is still flexible, so window sizes, shading and ventilation don’t have to be forced in after planning approval.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Part O, planning and nation-specific rules

Questions people ask

What is the difference between the simplified method and dynamic modelling?

The simplified method is a set of limits on glazing area and minimum openable areas, based on the home’s location and whether it can be cross-ventilated. It’s quick but can be restrictive. Dynamic thermal modelling simulates indoor temperatures hour by hour through a summer, which allows more design freedom and is often needed for heavily glazed homes, single-aspect flats or noisy sites.

Can I rely on air conditioning to meet Part O?

Mechanical cooling is treated as a last resort. Designs are expected to cut solar gain and use natural or mechanical ventilation first, and cooling is only considered where those measures can’t remove enough heat. Your assessor will explain how this applies to your scheme.

When should the overheating assessment be done?

As early as possible, ideally before the planning drawings are finalised. Overheating fixes often change how a building looks, such as smaller windows, external shading or larger openings, and making those changes after planning approval can mean further applications and delays.

Why does noise matter for overheating?

Part O expects windows to be opened at night to cool bedrooms, but that isn’t realistic if outside noise would disturb sleep. Where noise is high, the assessment has to rely on other ways of removing heat, such as mechanical ventilation, which changes the design. An acoustic consultant may be needed to assess the site.

Does Part O apply to my extension or loft conversion?

Generally not. Part O is aimed at new residential buildings, so extensions and loft conversions to an existing home usually aren’t assessed under it, although large glazed extensions can still get uncomfortably hot. Rules can differ for conversions and between nations, so check with your professional or building control.

What happens if some rooms fail the assessment?

The assessor identifies which rooms overheat and why, then tests changes such as external shading, glazing that lets in less solar heat, bigger openings or added ventilation. If the problem is caught early, small changes often solve it; later on, more significant redesign may be needed.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.